CAA ENGINEERING SERVICES

Net Zero De-Gassification

Degasification of Domestic Hot Water and Heater Hot Water Boiler Systems

Value

$2m

Duration

9mths

Contract Type

D+C

Status

Closed

Client: The Star Casino

Value: $2m

Project ID: 17

Role:
– Project management

Project Summary:
400 kW electric heat pump installation replacing 25-year-old 600 kW gas calorifiers for DHW and heating from Level 4 to Basement 4, using water-cooled units on the site-wide condenser water system, delivering ~$130k annual gas savings and a 20% reduction in gas intensity.

Degasification of Domestic Hot Water and Heater Hot water Boiler Sydnems

Key Deliverables

  • Replacement of aging gas calorifiers with new electric heat pump technology

  • Installation of a 400 kW water-cooled heat pump connected to condenser water system

  • Upgrades spanning multiple floors, from Level 4 to Basement 4

  • Reduction of ~20% in gas intensity for the precinct

  • Achieved approximately $130k in annual gas savings

  • Enabled electrification pathway for future net zero commitments

Degasification of Domestic Hot Water and Heater Hot water Boiler Sydnems