CAA ENGINEERING SERVICES
Net Zero De-Gassification
Degasification of Domestic Hot Water and Heater Hot Water Boiler Systems
Value
$2m
Duration
9mths
Contract Type
D+C
Status
Closed
Client: The Star Casino
Value: $2m
Project ID: 17
Role:
– Project management
Project Summary:
400 kW electric heat pump installation replacing 25-year-old 600 kW gas calorifiers for DHW and heating from Level 4 to Basement 4, using water-cooled units on the site-wide condenser water system, delivering ~$130k annual gas savings and a 20% reduction in gas intensity.
Key Deliverables
-
Replacement of aging gas calorifiers with new electric heat pump technology
-
Installation of a 400 kW water-cooled heat pump connected to condenser water system
-
Upgrades spanning multiple floors, from Level 4 to Basement 4
-
Reduction of ~20% in gas intensity for the precinct
-
Achieved approximately $130k in annual gas savings
-
Enabled electrification pathway for future net zero commitments