Major Infrastructure Plant Equipment - Electrical
Ground Power Unit Asset Replacement
Client: Sydney Airport Corporation
Value: $10m
Project ID: 13
Role:
– Project management
– Technical leadership
– Capacity assessment
– Design coordination
Project Summary:
CAA Engineering supported Sydney Airport’s Terminal 1 GPU renewal program, replacing 56 GPUs, installing 46 coiler systems and renewing submains, cable containment and circuit protection while completing load and capacity analysis and coordinating electrical interfaces. The new higher-efficiency GPUs improve electrical performance and support Sydney Airport’s long-term sustainability and Scope 3 emissions goals.
Key Deliverables
-
Replacement of 56 ground power units (GPUs)
-
Installation of 46 new coiler systems
-
Submains renewal and upgraded cable containment
-
Electrical circuit protection upgrades
-
Load and capacity analysis for future operational resilience
-
Improved sustainability outcomes through higher-efficiency assets
EM Lighting Replacement Precinct Wide
Client: Sydney Airport Corporation
Value: $6m
Project ID: 3
Role:
– Project management
– Design coordination
– Procurement
– Staging
Project Summary:
CAA Engineering supported Sydney Airport to replace legacy emergency and exit lighting with a modern wireless system of around 6,000 luminaires, new head-end equipment, wireless access points and software across multiple terminals and support buildings. We led surveys, upgrade strategies and stakeholder planning to improve compliance, reliability, system visibility and simplify testing and maintenance.
Key Deliverables
-
Replacement of ~6,000 emergency and exit luminaires
-
Deployment of wireless EM lighting technology
-
New head-end equipment and wireless access infrastructure
-
Precinct-wide upgrade strategy and compliance improvements
-
Simplified testing, maintenance, reporting and visibility
-
Stakeholder coordination across terminals and support buildings
Landside Electrical Bus Depot
Client: Sydney Airport Corporation
Value: $3m
Project ID: 37
Role:
– Project management
– Design coordination
Project Summary:
CAA Engineering is converting a diesel bus depot at Sydney Airport into an electric bus facility for about 30 buses, including substation and mains upgrades, new cabling and switchboards, ten 180 kW chargers and associated civil and layout changes. We are also implementing charge management systems to optimise charging and manage peak demand while keeping passenger transport services operating.
Key Deliverables
-
Conversion of diesel facility to electric bus depot
-
Substation and mains supply upgrades
-
Installation of 10 × 180 kW chargers
-
New electrical cabling and switchboards
-
Civil and layout reconfiguration for EV infrastructure
-
Implementation of smart charge management systems
eGSE Bay Electrification
Client: Sydney Airport Corporation
Value: $3.5m
Project ID: 38
Role:
– Project management
– Design for electrification
– Electrical and civil upgrades
– Staging
Project Summary:
CAA Engineering was engaged by Sydney Airport to electrify three 24/7 aircraft bays, supporting one of Australia’s first pooled electric ground support equipment (eGSE) models and reducing diesel GSE on the apron. The project converts about 25 diesel GSE units to electric, installs three 120 kW chargers, new EV boards, 300 m of new cable tray and cabling, and associated civil works, planned around bay closures and night-time curfews to avoid impacting flight operations.
Key Deliverables
-
Electrification of three continuous-operation aircraft bays
-
Conversion of ~25 diesel ground support units to electric
-
Installation of 3 × 120 kW GSE chargers
-
New EV distribution boards
-
300 m of cable tray and new cabling
-
Civil works coordinated around curfews and bay closures
-
Reduction of apron diesel emissions and operational impact
HV Asset Renewal – Substations & Reticulation
Client: Sydney Airport (SACL)
Value: $71m
Project ID: 39
Role:
– Project management
– Design-development
– Strategy development
– Tender documentation
Project Summary:
CAA Engineering is supporting Sydney Airport with a multi-year HV asset renewal program to reduce risk and maintain reliable supply to terminals and the airfield. The program replaces ageing oil-filled and SF₆-filled equipment with modern air-insulated assets, renews critical switchgear and feeders, upgrades protection and control systems, and is guided by a structured renewal strategy, prioritisation and technical tender documentation.
Key Deliverables
-
Replacement of aging oil-filled and SF₆-filled HV equipment
-
Upgrades to switchgear, feeders, protection and control systems
-
Structured renewal strategy and prioritisation modelling
-
Technical documentation for staged HV asset replacement
-
Increased reliability of HV supply to terminals and airfield
Electrical Central Energy Plant
Client: The Star Casino
Value: $14m
Project ID: 12
Role:
– Technical Project Management
– Design Management
Project Summary:
CAA Engineering delivered major HV upgrades for The Star, lifting capacity from 12 MVA to 16 MVA at both properties with new central energy plants, upgraded HV boards, RMUs, seven 4,000 A MSBs, 12 MW of backup generation and substation reconfiguration. Works involved 10 HV and 160 LV overnight shutdowns and were completed on time and 15% under budget in a constrained CBD and harbour-side environment.
Key Deliverables
-
Capacity upgrade from 12 MVA to 16 MVA
-
Delivery of new central energy plant infrastructure
-
Upgraded HV boards, RMUs and 4,000 A MSBs
-
Installation of 12 MW of backup generation
-
Complex shutdown coordination (10 HV & 160 LV)
-
Efficient delivery in heavily constrained environments