Major Infrastructure - Mechanical
Pre-Conditioned Air (PCA) Asset Replacement
Value
$8.3m
Duration
18mths
Contract Type
D+C
Status
Current
Client: Sydney Airport Corporation
Value: $8.3m
Project ID: 15
Role:
– Technical Project Management
– Asset Management Strategy
Project Summary:
Delivery of Sydney Airport’s pre-conditioned air systems for stationary aircrafts. Involved the assessment of electrical and mechanical systems, detailed design phase for PCA units, ductwork and apron bay integration.
Scope Highlights:
-
Assessment of mechanical and electrical PCA infrastructure
-
Detailed design for PCA units and ductwork integration
-
Coordination of apron bay interface requirements
-
Improved cooling performance for aircraft on stand
-
Enhanced asset reliability and lifecycle planning
T1 Chilled Water Network Upgrade
Value
$25m
Duration
2 years
Contract Type
D+C
Status
Current
Client: Sydney Airport Corporation
Value: $25m
Project ID: 16
Role:
– Technical Project Management
– Construction coordination
– Risk Mitigation Strategic Advice
Project Summary:
Upgrade to Terminal 1 chilled water distribution network. Involved extension of 860 m of CHW pipework between Central Services Building and T1 HVAC systems.
Scope Highlights
-
Installation of 860 m of new chilled water pipework
-
Integration with existing HVAC systems in T1
-
Construction staging in live airside environments
-
Increased cooling capacity and system resilience
-
Reduced risk of failure through upgraded infrastructure
T2 Central Energy Plant – Planning and Upgrade Strategy
Value
$18m
Duration
12mths
Contract Type
D+C
Status
Current
Client: Sydney Airport Corporation
Value: $18m
Project ID : 36
Role:
– Strategic Advisory
– Project Management
– Feasibility Advice
– Procurement Strategic Advice
Project Summary:
Management for the central energy plant upgrade to serve Terminal 3. The project will consolidate chilled and heating water generation and distribution into an efficient facility, replacing aging equipment and increasing resilience. Includes staging, temporary-works strategies to maintain cooling and heating to critical areas while new plant and distribution systems are installed and commissioned.
Scope Highlights
-
Consolidation of chilled and heating water systems
-
Replacement of aging generation and distribution equipment
-
Temporary-works strategies to maintain critical cooling/heating
-
Development of procurement and feasibility strategies
-
Increased operational resilience and efficiency
Sydney Integrated Resort Sea Water Plant Replacement (Condenser Water System)
Value
$12m
Duration
18mths
Contract Type
D+C
Status
Current
Client:The Star Casino
Value: $12m
Project ID: 11
Role:
– Client Representative
– Project Management
– Design Management
– Program Management
Project Summary:
Replacement of the 1,500 l/s (35 MW) seawater condenser system with 3 x 500 l/s Grundfos pumps, SuperDuplex SS pipework (1200 mm header), controls and Bernoulli filters, constructed 4 levels below ground and 7 m below sea level at Darling Harbour.
Scope Highlights
-
Replacement of major seawater condenser water systems
-
Installation of 3 × 500 l/s Grundfos pumps
-
SuperDuplex stainless steel pipework and 1200 mm header upgrades
-
Integration of Bernoulli filtration and new control systems
-
Complex construction below sea level with significant engineering constraints
-
Improved system reliability, efficiency and resilience