Operational Technology (OT)
Site-Wide BMS Upgrade (Multiple Sites)
Client: The Star Casino
Role: Client Representative, Project Management, Design Management
Project Summary:
Upgrade of a 15-year-old Honeywell Building Management System (BMS) to the latest EBI platform, modernising operational control and enhancing integration with ICT networks.
Scope Inclusions:
Upgrade and installation of 21 BMS panels
Over 6,000 BMS control points
Migration to converged ICT network infrastructure
Graphic interface redesign and COP analysis tool implementation
SCADA / Energy Management System Installation (Multiple Sites)
Client: The Star Casino
Role: Client Representative, Project Management, Design Management
Project Summary:
Implementation of a Schneider EcoStruxure SCADA and Energy Management System for load control and optimisation across a complex multi-building environment.
Key Deliverables:
Site-wide HV and LV load analysis
Creation of a new Load Shedding Table
Installation of 20 PLC boards across the precinct
Integration with existing electrical and mechanical systems
Fire System Upgrade
Client: Star Casino – Gold Coast Integrated Resort
Role: Client Representative, Project Management, Design Management
Project Summary:
Replacement of a 20-year-old fire protection system with full-scale integration of modern technologies, control room redundancy, and authority engagement.
Key Features:
New Fire Fan Control Panel and EWIS Control System
Updated Fire Indicator Panel (FIP) graphics
Staged integration across the facility to minimise disruption
Establishment of new Fire Control Room and full system redundancy in security control
Energy Analytics Platform Integration
Client: Star Casino – Gold Coast Integrated Resort
Role: Client Representative, Project Management, Design Management
Project Summary:
Deployment of an advanced energy analytics solution, integrated with both IT and OT environments, delivering near-real-time data monitoring and reporting.
Integration Highlights:
