Major Infrastructure Plant Equipment

Chilled Water Network Upgrade

Client: Sydney Airport

Value: Confidential
Sector: Transport / Aviation
Role: Project Management, Design Management, Business Case Advisory Services

Project Summary:

CAA developed a strategy to upgrade the Chilled Water Pipework infrastructure at Sydney Airport’s Terminal 1 to support its 2050 future upgrades. The project involved the replacement of 5km of pipework in an underground services tunnel. We developed a delivery strategy that avoided any disruption to the terminal during delivery.

Key Inclusions:

$

Presented business case to SYD Board for approval

$

Technical and feasibility assessments and consultant engagements

$

Tender management and procurement of D&C contractor

$

Stakeholder consultation and infrastructure planning for 2050 goals

Sydney Airport

Pre-Conditioned Air (PCA) Asset Replacement

Client: Sydney Airport Corporation

Value: $8.3 million
Role:Project Manager

Project Summary:

PCAs deliver temperature-controlled air to parked aircraft, reducing fuel use by allowing the Auxiliary Power Unit (APU) to be turned off. This project focused on replacing aging PCA units to increase operational reliability, compatibility with next-gen aircraft, and overall sustainability.

Scope Highlights:

$

Development of proactive asset renewal strategy

$

Assessment of upstream electrical connections and required upgrades

$

Detailed designs for unit locations and technical integration

$

Tender documentation and prioritised delivery schedule aligned with airport operations

$8.3M

Visual Guidance Docking System (NIGS/VDGS) Renewal

Client: Sydney Airport Corporation

Value: $11.9 million
Role: Project Manager

Project Summary:

Up to 81 docking units across Sydney Airport’s terminals were assessed and scoped for refurbishment or replacement. These systems are critical to SYD’s operational efficiency and aircraft safety on arrival.

Key Deliverables:

$

Full technical and structural assessment of all existing NIGS

$

Defined upgrade or replace strategies for each unit

$

Electrical and façade interface reviews

$

Prioritised renewal program to reduce disruption and enhance precision docking

$11.9M

Ground Power Unit (GPU) Asset Replacement

Client: Sydney Airport Corporation

Value: $10 million
Role: Project Manager

Project Summary:

Upgrade and replacement of 56 Ground Power Units and installation of 46 coiler systems to support aircraft during turnaround. The project aligns with SYD’s sustainability goals, significantly improving energy efficiency.

Key Outcomes:

$

Replacement of GPU infrastructure and circuit protection

$

Electrical submains and containment upgrades

$

Increased electrical efficiency by 25%

$

Estimated energy reduction of 2.56M kWh/year (~$982K annual savings)

$10M

High Voltage Network Upgrades x2

Client: The Start Casino

Value: $8 million
Role: Project Manager

Project Summary:

Two major HV upgrades across The Star Casino properties to increase redundancy, improve safety, and align with long-term infrastructure planning.

Scope 1:

$

Replacement of HV boards, RMUs, 4000A MSBs, and cabling

$

Delivery of 12MW backup generation

$

Executed over 160 planned electrical shutdowns

Scope 2:

$

Upgrade from 12MVA to 16MVA via 11kV Energex network

$

New metering stations and reconfigured zone substation

$

Masterplan-aligned redundant HV supply and increased gas flow capacity

$8M

Qiddiya Entertainment Precinct (Saudi Arabia)

Client: Introba MEP Consultants

Value: Confidential
Role: Project Manager, Desin Manager

Project Summary:

Management of schematic and detailed MEP design delivery for a $3.5B USD E-Gaming precinct in Riyadh. Coordination of 31 design consultants across multiple disciplines and time zones.

Key Tasks:

$

Coordination of design deliverables and stakeholder expectations

$

Program management of all MEP-related documentation

$

Liaison between Introba and wider project team

Data Centre Deployment – Vienna & Madrid

Client: Confidential

Value: €80 million
Role: Design Management, Procurement Management

Project Summary:

Overseeing global design and procurement for mission-critical data centre facilities in Europe.

Key Deliverables

$

Design management from RIBA Stage 2–4

$

Procurement of all key MEP plant and systems: MV boards, TXs, eHouses, UPS, generators, and evaporative cooling units

€80M

Sea Water Condenser Plant Replacement

Client: Star Casino – Sydney Integrated Resort

Value: $12 million
Role: Client Representative, Project Management, Design Management, Program Management

Project Summary:

Replacement of the entire sea water condenser water system located 7 metres below sea level in Darling Harbour, supporting 35MW of cooling capacity.

Key Tasks:

$

3 x 500 l/s Grundfos Super Duplex SS pumps

$

1200mm primary header, controls, and Bernoulli filtration

$

Delivered in a high-risk marine environment under the active resort

$12M

Chilled Water Central Energy Plant Upgrade

Client: Star Casino – Gold Coast Integrated Resort

Value: $19 million
Role: Project Management, Design Management

Project Summary:

Replacement of 15MW of chillers with a new 22MW capacity plant including 5 x 4MW units and 30MW Cooling Tower farm. Included integrated condenser heat exchange for optimal energy transfer.

$19M

Electrical Central Energy Plant Upgrade

Client: Star Casino – Gold Coast Integrated Resort

Value: $10 million
Role: Client Representative, Project Management, Design Management

Project Summary:

Major electrical infrastructure upgrade to support future energy needs. Included HV and MSB upgrades, backup power generation, and carefully managed shutdowns.

Highlights:

$

3 x HV Boards, RMUs, 7 x 4000A MSBs

$

12MW of backup generation

$

160 coordinated electrical shutdowns

$10M