Net Zero – Degasification
Air-Source Heat Pump Upgrade
Client: University of Sydney
Value: $1.8 million
Role: Client Representative, Project Management, Design Management
Project Summary:
A full replacement of the existing 1.8 MW gas boilers and all field pipework with energy-efficient air-source heat pumps. The project included recommissioning FCUs and heating coils to align with new heating hot water (HHW) setpoints.
Key Inclusions:
Rooftop feasibility study for structural support
Courtyard spatial allowance assessment
Heat load calculations and electrical assessment
Scoping and tender management
Stakeholder consultation within a 24/7 live teaching & research environment
Safe management of asbestos in risers and pipe insulation

$1.8M
Electric Heat Pump Upgrade
Client: Star Casino – Gold Coast Integrated Resort
Value: $1.6 million
Role: Client Representative, Project Management, Design Management
Project Summary:
Installation of a 400kW Electric Heat Pump system to replace aging gas calorifiers responsible for domestic hot water supply across multiple building levels (L4 to B4). The upgrade supports the resort’s energy reduction goals.
Key Outcomes:
Integration with site-wide condenser water system
Replaced 25-year-old infrastructure
Achieved $130K annual gas savings
Reduced gas intensity by 20%